Description:
1. The honeycomb ceramic substrate have a very competitive substrates. 2. We can produce 100CPSI, 200CPSI, 400CPSI, 600CPSI can be in the shape of round, racetrack 3. Specification can be custom as the the customers requirement. 4. Can be coated with the catalyst and the noble metal as the customers emission standards: Euro II, EuroIII and EuroIV and EPA standard and the Cariforlia standardsParameters:
★ Excellent fitment and easy installation ★ Strict quality control during the process ★ Professional design ★ shortest time for production and soonest delivery ★ Highly inspected before shipping ★ Delivery on time and best after-sales serviceSpecifications:
OE NO. | Car Fitment: | Mold | Year: |
18327643152 | Bmw | 340i | 2016-2018 Sedan(F30) |
340i GT xDrive | 2017-2018 F34 | ||
340i xDrive | 2016-2018 Sedan(F30) | ||
440i | 2017-2018 Convertible(F3 | ||
440i Gran Coupe | 2017-2018 F36 | ||
440i xDrive | 2017-2018 Convertible(F3 | ||
440i xDrive Gran Coupe | 2017-2018 F36 | ||
740i | 2016-2018 Sedan(G12) | ||
740i xDrive | 2017-2018 Sedan(G12) | ||
Product name | CATALYTIC CONVERTER FOR BMW 340i 2016-2018 Sedan(F30) ALZ LEFT EXHAUST PIPE | ||
Model Number | DJN53-61 | ||
Brand Name | DJN | ||
Emission Standard: | EURO 2/3/4/5 | ||
Material | Inside : ceramic(honeycomb) substrate 400cpsi with mat | ||
Shell :304 or 409 # stainless steel shell,stainless steel pipe | |||
Oxygen sensor ports | Yes | ||
cpsi | 400 /600/800 | ||
Wall thickness | 0.09±0.025 | ||
Warranty | 30000 miles performance/2 years | ||
Packaging: | Air bubble film and Carton Packing | ||
MOQ: | 50 pcs | ||
Supply Ability | 1000 Piece/Pieces per Week | ||
Place of Origin: | Jiangsu | ||
SAMPLE ORDER: | Accept | ||
Condition | new | ||
Function | reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency; | ||
Service | Customers' specific demands available, design drawings are welcomed. OEM service is accepted | ||
Supply Ability | 1000 Piece/Pieces per Month | ||
Packaging & delivery | Air bubble film and Carton Packing, inside fix the product decently with expanded material | ||
Port | Shanghai/Ningbo | ||
Lead time: | 10-30 days . | ||
Active catalyst ingredients | Pt, Pd, Rh, and rare earth elements | ||
Shape | round, oval, race track |